SPCC plan template › SPCC plan requirements

SPCC plan requirements: the checklist

An SPCC plan must be written, approved by a manager who can commit the money, and certified (by a PE, or by the owner at a qualified facility). It must list your containers (and, except in a Tier I plan, show them on a facility diagram), describe how you prevent, contain and respond to spills, your containment, inspections, training and security, and who to call. The checklist below follows 40 CFR 112.7 and, for most facilities, 112.8.

Updated November 2026. From 40 CFR 112.7 and 112.8 on eCFR, read November 13, 2026. Section 112.8 covers onshore facilities other than oil production; production, drilling and animal-fat or vegetable-oil sites follow 112.9, 112.10 or 112.12 instead.

The general requirements (112.7)

If your plan doesn't follow the order of 112.7, it must include a section cross-referencing where each requirement is met.
ElementRuleWhat to write
Management approval112.7 introSignature of someone with authority to commit the resources to implement the plan
Plans not yet in place112.7 introEquipment or procedures not yet operating, in separate paragraphs, with installation and start-up details
Conformance112.7(a)(1)How the facility meets each applicable requirement
Deviations112.7(a)(2)For any rule you meet another way: the reason and how the alternative gives equivalent protection (not allowed for containment rules, and PE-only)
Layout and facility diagram112.7(a)(3)Location and contents of each fixed container, the area for portable containers, transfer stations and connecting pipes; exempt buried tanks marked "exempt"
Container list112.7(a)(3)(i)Oil type and capacity of each fixed container; for portable containers, the number, oils and capacities, or an estimate
Prevention112.7(a)(3)(ii)Routine handling: loading, unloading and transfers
Drainage controls112.7(a)(3)(iii)Containment around containers and equipment, and how a discharge is controlled
Countermeasures112.7(a)(3)(iv)How spills are discovered, responded to and cleaned up, by your crew and by contractors
Disposal112.7(a)(3)(v)How recovered oil and sorbents are disposed of legally
Contact list112.7(a)(3)(vi)Response coordinator, National Response Center, cleanup contractors, federal, state and local agencies
Reporting information112.7(a)(4)What a caller must give: address, time, oil, quantity, source, cause, media affected, injuries, actions, evacuation, who else was called
Emergency use112.7(a)(5)Spill procedures organized so they can be used in an emergency
Failure prediction112.7(b)For each likely equipment failure: direction, rate of flow and total quantity of oil
General containment112.7(c)Dikes, berms, curbing, drip pans, sumps, sorbents or similar wherever oil could escape, sized for the typical failure
Impracticability112.7(d)Only with a PE: why containment isn't practicable, plus integrity testing and a contingency plan
Inspections and records112.7(e)Written inspection procedures; signed records kept with the plan for three years
Training112.7(f)Who is trained, the accountable person, annual briefings
Security112.7(g)Access control, locked valves and pump starters, capped connections, lighting
Loading racks112.7(h)Only if you have a tank car or tank truck rack: containment for the largest compartment, interlocks or chocks, outlet checks
Brittle fracture112.7(i)Field-erected tanks only: evaluation after repair, alteration or failure
State rules112.7(j)Conformance with stricter state rules
Oil-filled equipment112.7(k)Optional: inspections plus a contingency plan instead of containment, if that equipment has a clean spill record

The specific requirements for most facilities (112.8)

A yard, shop, farm, warehouse or plant that isn't an oil production site adds these:

What a Tier I plan may simplify

A Tier I qualified facility meets a shorter list set out in 112.6(a)(3). It skips the facility diagram, the conformance and deviation paragraphs, the prevention, drainage-control and disposal descriptions of 112.7(a)(3)(ii), (iii) and (v), loading racks, brittle fracture and the state-rules paragraph, and from 112.8 the undiked-area drainage rules and the piping rules other than regular inspection. Three rules are simplified: it predicts direction and total quantity of a failure without the rate of flow, sizes containment for every bulk container including portable ones, and may describe a written overfill procedure instead of picking an alarm from (c)(8). It may not include deviations or impracticability determinations at all; EPA's template already follows this list. The Tier I vs Tier II guide sets out the rest.

Five kinds of information every plan holds

A question people often search is which five types of information are in an SPCC plan. The rule doesn't number them, but a plan always holds: (1) a description of the facility and its oil containers, with a diagram unless it's a Tier I plan; (2) how spills are prevented in day-to-day handling; (3) how a spill is contained and kept from water; (4) how a spill is found, reported and cleaned up, with the contact list; and (5) the inspection, training and record-keeping program that keeps the plan true.

One more form: the substantial harm certification

Larger sites may also need a Facility Response Plan: one that transfers oil over water to or from vessels and has 42,000 gallons or more, or one with 1 million gallons or more that meets one of four other conditions (112.20(f)). A facility that doesn't meet those criteria completes the one-page "Certification of the Applicability of the Substantial Harm Criteria" in Attachment C-II of Appendix C to 40 CFR 112 and keeps it at the facility (112.20(e)). For a small yard, shop or farm the answers are all no, but the signed form is still expected.

Keep it current

Amend the plan within six months of any change that affects spill potential, and review it at least every five years (review and amendments). Keep a complete copy at the facility if it's attended at least four hours a day.