spccplantemplate.com

Published by Winding AI, Inc., the company that makes ePlan.

SPCC plan template: which one your facility may use

If your facility has 10,000 gallons or less of aboveground oil storage capacity and no reportable spill history, you may write and sign the plan yourself. With no container over 5,000 gallons (Tier I), use EPA's free Appendix G template. With a bigger container (Tier II), write a full plan to 40 CFR 112.6(b). Above 10,000 gallons, a Professional Engineer must certify it.

"No reportable spill history" means that in the three years before you sign, no single spill put more than 1,000 gallons of oil into water or onto a shoreline, and no two spills in any 12 months each put more than 42 gallons there. Spills caused by natural disasters, war or terrorism don't count (40 CFR 112.3(g)).

Updated November 2026. The rule text was read on eCFR (current to November 10, 2026) and EPA's pages on November 13, 2026; every price below was read on the provider's own site the same day.

Which plan your facility needs

Count the shell capacity of every aboveground container of 55 gallons or more, not what is in it today. Then find your row.

Thresholds from 40 CFR 112.1(d)(2), 112.3(g) and 112.6, read November 13, 2026. Farms have different numbers under a 2014 law; see the farm guide.
Your facilityWhat the rule requiresWho signsTemplate you can start from
1,320 gal or less aboveground and 42,000 gal or less completely buriedNo SPCC plan (but clean up any spill you have)NobodyNone needed
A spill could not reasonably reach a creek, ditch, lake or storm drain that leads to oneNo SPCC plan; judge the land itself, not your dikes or berms (EPA recommends writing down why)NobodyNone needed
Tier I: 10,000 gal or less, no container over 5,000 gal, clean historySelf-certified plan: EPA's Appendix G template, or an equivalent plan with a cross-reference sectionOwner or operatorEPA Tier I template
Tier II: 10,000 gal or less, at least one container over 5,000 gal, clean historySelf-certified full plan to 112.7 and subpart B or COwner or operator; a PE for any section that deviates from a rule or calls containment impracticableCAL FIRE's Tier II template, Ecesis's template, or a draft
Over 10,000 gal, or a reportable spill in the last three yearsFull plan certified by a licensed Professional Engineer (PE)A PE, who (or whose agent) must visit the siteThe engineer's own format
Check your state first. Self-certification is a federal option, and EPA warns that some states limit SPCC certification to PEs. Ask your state, or start from EPA's list of state PE licensing boards. You don't file the plan with EPA; you keep it at the facility and show it to an inspector who asks.

Seven ways to get the plan written

Three are free templates you fill in yourself, two are software, one is a filled-in draft and one is an engineer. None of the templates is filled in for you.

Prices in US dollars, read on each provider's site on November 13, 2026. "Who signs" is set by the rule, not by the product.
OptionPriceFor which facilitiesWhat you getFilled in for you?
EPA Tier I templateFreeTier I onlyWord file of Appendix G, two sample plans (a farm, an auto garage), containment worksheetsNo
CAL FIRE OSFM Tier II templateFreeTier II; written for California's APSA programEPA's Tier I layout with the 112.6(b) requirements addedNo
Ecesis SPCC plan templateFree; Ecesis SPCC software priced on requestFull-format plans (PE or Tier II)Word or PDF section framework with guidance notesNo
Mitti (by SafetyCulture)Free plan up to 10 seats; Premium $24 a seat a month billed yearly, $29 monthlyTier 1 and Tier 2 versionsDigital checklists you fill on a phone or export as PDFNo
mySPCC (Asmark Institute)No public priceAgricultural retailers, Tier I and Tier IIWeb tool that tailors a plan to the facilityGuided
ePlanFree to read; $49 to download one document's Word file; Pro $99 a monthQualified facilities, 10,000 gal or lessDraft plan, monthly inspection log and training record from your address and tank listYes, a draft with gaps marked
PE-certified planBy quote; EPA estimates $2,111 to certify a new plan at a 1,321 to 10,000 gal siteRequired over 10,000 gal or with a spill historySite visit, engineered plan, PE certificationYes

EPA Tier I Qualified Facility SPCC Plan Template

Best for Tier I sites that will fill in a form themselves

This is the template in Appendix G of 40 CFR 112, re-typed as a Word file with an optional "N/A" column. Completed and signed by the owner or operator of a Tier I facility, it is the plan. EPA also posts two completed examples (a farm and an automotive service garage) and worksheets for sizing dikes. EPA's own paperwork estimate is 4 hours to prepare a new Tier I plan.

The catch: it covers Tier I only, and it is blank. You list every container, predict where a spill would flow, describe your containment and write your own inspection program. If you change its wording, your plan must add a section cross-referencing each rule requirement.

EPA's template page · The Word file · Sample farm plan

CAL FIRE OSFM Tier II Qualified Facility SPCC Plan Template

Best for Tier II sites, especially in California

EPA publishes no Tier II template. California's Office of the State Fire Marshal offers one, based on a template by the CalCUPA Forum's APSA working group: it keeps EPA's Tier I layout, adds what 40 CFR 112.6(b) requires of a Tier II plan, and leaves room for a PE to certify the sections only a PE may. California adds its own Aboveground Petroleum Storage Act on top of the federal rule, so check with your local CUPA too.

CAL FIRE OSFM APSA program

Ecesis SPCC Plan Template

Best for a full-format plan skeleton

A free Word or PDF framework organized around 40 CFR 112.7 and 112.8, with guidance notes and tables, including a PE certification page. It suits a Tier II owner or an engineer writing a full plan. Ecesis also sells SPCC software (container database, plan generation, amendment reminders) priced on request.

Ecesis template

Mitti (by SafetyCulture)

Best for running the inspections on phones

Mitti's library has a Tier 1 SPCC template based on EPA's and a Tier 2 checklist based on EPA's inspector guidance. Its strength is the follow-through: monthly inspections, photos and sign-offs on a phone. The free plan covers up to 10 seats; Premium is $24 a seat a month billed yearly or $29 monthly.

Mitti's SPCC template

mySPCC (Asmark Institute)

Best for agricultural retailers

A web tool for Tier I and Tier II plans at farm-supply and fertilizer retail sites, sponsored by The Fertilizer Institute, built with the Asmark Institute and listed on EPA's agriculture page with an EPA letter of support. Asmark lists no price on its site.

mySPCC

ePlan

Best for a first draft filled in from your site

ePlan asks four questions: where the site is, which tanks, drums and totes you have, whether you've had a spill to water in three years, and who will certify. It then looks up the parcel, the nearest stream or ditch (USGS National Hydrography Dataset), wetlands (USFWS), slope (USGS 3DEP) and flood zone (FEMA), and drafts a plan for a Tier I or Tier II facility, modeled on EPA's Tier I template, plus a monthly inspection log and a training record. Anything it can't confirm is marked for you to check, pick or fill in.

Reading the draft is free. The Word file of one document costs $49, with revisions for 30 days; Pro is $99 a month. ePlan certifies nothing: you visit the site, check every line and sign. It doesn't handle plans over 10,000 gallons or the sections only a PE may certify. Its draft is not EPA's form, so for a Tier I plan either copy it into EPA's template or keep the cross-reference section the rule requires.

ePlan's SPCC plan draft · Pricing

A PE-certified plan from an engineering firm

Required over 10,000 gallons or after a reportable spill

The engineer or an agent visits the site and attests that the plan follows good engineering practice. For a storage site of 1,321 to 10,000 gallons, EPA's 2023 paperwork estimate puts PE certification of a new plan at $2,111, and $3,974 at 10,001 to 42,000 gallons, in 2021 dollars. Quotes vary with the site. A PE is also the only route for a Tier II plan that needs an equivalence or impracticability call.

Find your state's PE board

Which option fits

What's inside EPA's Tier I template

Every Tier I self-certifier completes Sections I to III and one of Sections A to C, then the attachments:

  1. I. Self-certification statement. Eight statements under 112.6(a)(1), including that you visited and examined the facility and that management will fund the plan.
  2. II. Review and amendment record. The five-year review and technical amendments.
  3. III. Plan requirements. Container list with shell capacities (Table G-2), containment and spill-flow table (G-4), inspections and training (G-5), security (G-6), emergency procedures (G-7), contact list (G-8), the National Response Center call (G-9) and the 60-day report rule.
  4. A, B or C. A for onshore facilities other than oil production (most yards, farms and shops), B for production sites, C for drilling and workover.
  5. Attachments. Review and amendment logs, an optional contingency plan, inspection, dike-drainage and training logs, and a discharge notification form.

Questions

What requires an SPCC plan?

Three things together: a facility that is not transportation-related stores, uses or handles oil; it has more than 1,320 gallons of aboveground capacity in containers of 55 gallons or more, or more than 42,000 gallons completely buried; and, judging the land alone, a spill could reasonably reach navigable water or a shoreline.

Can I write my own SPCC plan?

Yes, if the facility is a qualified facility: 10,000 gallons or less aboveground and no reportable spill in three years. A Tier I site may sign EPA's template; a Tier II site signs a full plan it wrote. Your state may still require a PE.

Is there an official Tier II template?

Not from EPA. EPA's template is for Tier I. California's Office of the State Fire Marshal publishes a Tier II template; elsewhere a Tier II plan is a full plan written to 40 CFR 112.7 and the subpart for your oil.

Do I send the SPCC plan to EPA?

No. Keep a complete copy at the facility if it is attended at least four hours a day, otherwise at the nearest field office, and show it to an EPA inspector during working hours.

How often must an SPCC plan be reviewed?

At least once every five years, with a signed statement that you will or won't amend it. A change that affects spill potential, such as adding a tank, needs an amendment within six months.

Is WSDOT's SPCC plan template the same thing?

No. Washington DOT's template is for its construction contractors under its Standard Specification 1-07.15(1). It is a contract spill plan, not the 40 CFR 112 plan a facility that stores oil needs.

Guides

How we checked

On November 13, 2026 we read 40 CFR 112 on eCFR, EPA's SPCC pages, its Tier I template and its 2023 paperwork estimate for the rule (ICR 0328.19), then each provider's own page and pricing. We did not run a plan through every tool and gave nobody a score or rating. If something here is wrong, write to support@winding.ai and we'll fix it.

About this site

This site is published by Winding AI, Inc., the company that makes ePlan, one of the seven options compared here. We earn money when someone buys ePlan; we earn nothing from links to other options, and links to ePlan carry a tag so ePlan can count visits from this site. We wrote it because the top results for "spcc plan template" hand you a form without saying whether you may use it. Visits are counted with Google Analytics; there are no ads.